DOMESTIC WASTEWATER TREATMENT SYSTEM IN MUSASHI PLANT, 42M3 CAPACITY. DAY AND NIGHT


Figure 1: Mushshi Plant



Figure 2: Lifting and lowering tank in installation site, anchoring cable and pumping water for fixing tank.




Figure 3: Work completed and operated

Figure 4: System of contral cabinet and gas blower machine

Figure 5.1: Moving Bed Biofilm Reactor MBBR1

Figure 5.2: Moving Bed Biofilm Reactor MBBR2

Figure 6: Taking after-treatment water sample